Virginia Bids > Bid Detail
Cedar Street Culvert Replacement Project ITB
Agency: | State Government of Virginia |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD14089971709600216 |
Posted Date: | Mar 17, 2023 |
Due Date: | Apr 19, 2023 |
Solicitation No: | IFB 13008 |
Source: | To access the bid document, please visit the agency's website at below and search by your matched keyword: https://mvendor.cgieva.com/Ven... |
Views: Current Version (
)
All Versions
(
)
Details
Details
IFB-13008
-
Cedar Street Culvert Replacement Project ITB
- Status: Open
- Time Left:32 days
- Closing:4/19/23 3:00 PM
- Issued:3/17/23 5:08 PM
- Last Updated:
- Buyer:Nicole Robertson
-
nicole.robertson@harrisonburgva.gov - 540-432-7794
IFB-13008
-
Cedar Street Culvert Replacement Project ITB
- Status: Open
- Time Left:32 days
- Closing:4/19/23 3:00 PM
- Issued:3/17/23 5:08 PM
- Last Updated:
- Buyer:Nicole Robertson
-
nicole.robertson@harrisonburgva.gov - 540-432-7794
Actions
- Issued By:City of Harrisonburg
- Opportunity Type:Invitation for Bids (IFB)
- Category:Construction
- Work Location:Harrisonburg, Virginia
- Website:
- Pre-Bid Conference:See solicitation documents for optional prebid/proposal conference/site visit.
- Open Responses:See solicitation documents Public Opening information.
-
Summary:Removal and replacement of double cell 4’ x 6’ box culvert, culvert wingwalls, as well as CG-6 Curb & Gutter. Installation and repair of DI-3B storm drain inlet structures and installation of Reinforced Concrete storm water conveyance pipe will be needed. Removal of corrugated metal storm pipe, removal of abandoned sanitary sewer line, tree removal, excavation, grading, installation of matting, installation of Class 1 rip rap stone, and seeding to properly tie-in and stabilize the existing stream channel. Backfill voids, install road base material 21A stone, install base mix asphalt concrete BM-25.0A, install surface mix asphalt concrete SM-9.5A on places along Cedar Street and South Dogwood Drive. Pavement planning of in-place asphalt concrete pavement, and utility field adjustments, together with all required traffic control, other incidental items required to complete the work and in accordance with the general requirements specified herein.
Work must be completed by November 30, 2023.
Documents
Document | Size | Description | Posted On | Type |
0300 Detailed Bid Form_LOCKED.xlsx | (14.42 KB) | 0300 Detailed Bid Form | 3/17/23 | RFx Document |
1000 Cedar Street and South Dogwood CADD Drawings 3-17-2023 - Bid Set.pdf | (38.32 MB) | 1000 Drawings | 3/17/23 | RFx Document |
2023028-PW-B_Cedar St Culvert Replacement ITB_FINAL_03-17-23.pdf | (2.11 MB) | Cedar Street Culvert Replacement Project ITB | 3/17/23 | RFx Document |
Follow B2B ActivityUnfollow B2B ActivityAdd B2B Posting
There are no B2B messages to display
- I1_1. Total Bid Amount from 0300 Detailed Bid Form
- NIGP Code:
- Quantity: 1.00000
- Delivery Date:
B2B Follow
×
Enter Email Address:
CloseSubmit
B2B Unfollow
×
Enter Email Address:
CloseSubmit
Add B2B Posting
×
Contact Name:
Company Name:
Email Address:
Phone Number:
SWaM Certifications:
Micro Business
Small Business
Minority Owned Business
Women Owned Business
Service Disabled Veteran Owned
Employment Service Org
Micro Business
Small Business
Minority Owned Business
Women Owned Business
Service Disabled Veteran Owned
Employment Service Org
Message:
CloseSubmit
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.