Virginia Bids > Bid Detail

IFB 24-025-CJ Water Treatment Plant RO Membrane Re...

Agency: State Government of Virginia
Level of Government: State & Local
Category:
  • 46 - Water Purification and Sewage Treatment Equipment
  • 68 - Chemicals and Chemical Products
Opps ID: NBD14089750905743099
Posted Date: Feb 27, 2024
Due Date: Mar 5, 2024
Solicitation No: IFB 59223-2
Source:

To access the bid document, please visit the agency's website at below and search by your matched keyword:

https://mvendor.cgieva.com/Ven...
Views: Current Version ( 15 ) All Versions ( 446 )
Details


IFB-59223


  • IFB 24-025-CJ Water Treatment Plant RO Membrane Replacement
    i
  • Round:2
  • Status: Open
  • Time Left:6 days, 20 hours
  • Closing:3/5/24 2:00 PM
  • Issued:2/15/24 2:18 PM
  • Last Updated:2/27/24
  • Buyer:Christine Joyce

  • cjoyce@gloucesterva.info
  • 804-693-1208



IFB-59223


  • IFB 24-025-CJ Water Treatment Plant RO Membrane Replacement
    i
  • Round:2
  • Status: Open
  • Time Left:6 days, 20 hours
  • Closing:3/5/24 2:00 PM
  • Issued:2/15/24 2:18 PM
  • Last Updated:2/27/24
  • Buyer:Christine Joyce

  • cjoyce@gloucesterva.info
  • 804-693-1208

Actions
Solicitation only accepts paper responses.
  • Issued By:Gloucester County
  • Opportunity Type:Invitation for Bids (IFB)
  • Category:Construction
  • Work Location:Gloucester County, VA
  • Website:
  • Pre-Bid Conference:See solicitation documents for optional prebid/proposal conference/site visit.
  • Open Responses:See solicitation documents Public Opening information.
  • Summary:The water treatment plant Reverse Osmosis (RO) system consists of two CodeLine skids, set up in parallel, Skid No. 1 and Skid No. 2. They were brought online in 2003. The RO skids were designed to process a well water supply containing about 2385 mg/l total dissolved solids (TDS) with a through put of 694 gallons per minute per skid. The RO Membranes are housed in FRP pressure vessels (manufacturer: Pentair Water Treatment). Each pressure vessel holds 7 membrane elements of 8 inches in diameter and 40 inches long.

    Both RO Skid No. 1 and Skid No. 2 membranes were replaced in 2009. Subsequently, Skid No. 2 membranes were replaced in 2018. The County desires to have the membranes replace in Skid No. 1 and minor repairs made to the RO support structure, valves, and piping.
  • Round Information:Addendum 1

Documents
Document Size Description Posted On Type
Addendum 1 FINAL.pdf (196.56 KB) Addendum 1 2/27/24 RFx Document
Final IFB 24-025-CJ REBID WTP RO Membrane.pdf (3.22 MB) Solicitation 2/15/24 RFx Document
Follow B2B ActivityUnfollow B2B ActivityAdd B2B Posting
There are no B2B messages to display
B2B Follow ×
Enter Email Address:
CloseSubmit
B2B Unfollow ×
Enter Email Address:
CloseSubmit
Add B2B Posting ×
Contact Name:
Company Name:
Email Address:
Phone Number:
SWaM Certifications:

Micro Business

Small Business

Minority Owned Business

Women Owned Business

Service Disabled Veteran Owned

Employment Service Org
Message:
CloseSubmit

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >