Virginia Bids > Bid Detail
IFB 158421- Fender Replacement - Dolphin
Agency: | State Government of Virginia |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD14089235216324593 |
Posted Date: | Sep 29, 2023 |
Due Date: | Oct 10, 2023 |
Solicitation No: | IFB 28485-3 |
Source: | To access the bid document, please visit the agency's website at below and search by your matched keyword: https://mvendor.cgieva.com/Ven... |
Views: Current Version (
5
)
All Versions
(
824
)
Details
Details
IFB-28485
-
IFB 158421- Fender Replacement - Dolphin
i - Round:3
- Status: Open
- Time Left:10 days, 15 hours
- Closing:10/10/23 11:00 AM
- Issued:9/1/23 2:03 PM
- Last Updated:9/29/23
- Buyer:Kim Dobra
-
kim.dobra@vdot.virginia.gov - 804-524-6016
- Converted Solicitation Reference #:IFB-A501-0000158421-1
IFB-28485
-
IFB 158421- Fender Replacement - Dolphin
i - Round:3
- Status: Open
- Time Left:10 days, 15 hours
- Closing:10/10/23 11:00 AM
- Issued:9/1/23 2:03 PM
- Last Updated:9/29/23
- Buyer:Kim Dobra
-
kim.dobra@vdot.virginia.gov - 804-524-6016
- Converted Solicitation Reference #:IFB-A501-0000158421-1
Actions
- Issued By:Virginia Department of Transportation
- Opportunity Type:Invitation for Bids (IFB)
- Category:Non-professional Services - Non-Technology
- Work Location:Hopewell, Virginia
- Website:
- Open Responses:See solicitation documents Public Opening information.
- Summary:Fender Replacement - Dolphin - Benjamin Harrison Bridge
- Round Information:Addendum 3 - extend closing date and questions and answers.
Documents
Document | Size | Description | Posted On | Type |
158421ADD1.pdf | (156.45 KB) | Addendum 1 | 9/29/23 | RFx Document |
ATTACHMENT D-J Required Forms.pdf | (254.67 KB) | ATTACHMENT D-J Required Forms.pdf | 9/29/23 | RFx Document |
158421 BHB Fender Replace-Dolphin Specifications.pdf | (1.87 MB) | 158421 BHB Fender Replace-Dolphin Specifications.pdf | 9/29/23 | RFx Document |
158421ADD2.pdf | (159.06 KB) | Addendum 2 | 9/29/23 | RFx Document |
158421ADD3.pdf | (214.4 KB) | Addendum 3 | 9/29/23 | RFx Document |
ATTACHMENT K-M Security-CADD Forms.pdf | (405.86 KB) | ATTACHMENT K-M Security-CADD Forms.pdf | 9/29/23 | RFx Document |
Follow B2B ActivityUnfollow B2B ActivityAdd B2B Posting
- l1_1. Installation of Steel Sheet Pile (PS-31) Unit of measure HOUR shall represent SF
- NIGP Code: 91367 Maintenance, Repair, and Operation of Drawbridges
- Quantity: 85,640.00000 Hour
- Delivery Date:
- l1_2. Hydraulic Cement Concrete Unit of measure HOUR shall represent CY
- NIGP Code: 91367 Maintenance, Repair, and Operation of Drawbridges
- Quantity: 3,366.40000 Hour
- Delivery Date:
- l1_3. Reinforcing steel Unit of Measure HOUR shall represent LB
- NIGP Code: 91371 Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc)
- Quantity: 597,040.00000 Pound
- Delivery Date:
- l1_4. STONE NO. 57, STONE Course Aggregate No. 57
- NIGP Code: 75035 Crushed Stone (Includes Riprap)
- Quantity: 16,002.00000 ton (UK) or longton (US)
- Delivery Date:
- l1_5. High Potential Magnesium Anode and Attachments Unit of measure HOUR shall represent EA
- NIGP Code: 91367 Maintenance, Repair, and Operation of Drawbridges
- Quantity: 224.00000 Hour
- Delivery Date:
- l1_6. Dismantle and remove existing fender system Unit of Measure HOUR shall represent LS
- NIGP Code: 91367 Maintenance, Repair, and Operation of Drawbridges
- Quantity: 1.00000 Hour
- Delivery Date:
- l1_7. Electrical Work Unit of Measure HOUR shall represent LS
- NIGP Code: 92531 Electrical Engineering (Incl. Cogeneration Design Services)
- Quantity: 1.00000 Hour
- Delivery Date:
- l1_8. One time mobilization
- NIGP Code: 91371 Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc)
- Quantity: 1.00000 each
- Delivery Date:
- l1_9. Construction Surveying
- NIGP Code: 91371 Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc)
- Quantity: 1.00000 each
- Delivery Date:
- l1_10. Baseline Progress Schedule Unit of Measure HOUR shall represent LS
- NIGP Code: 91367 Maintenance, Repair, and Operation of Drawbridges
- Quantity: 1.00000 Hour
- Delivery Date:
- l1_11. Progress Schedule updates Unit of Measure Hour represents Each
- NIGP Code: 91367 Maintenance, Repair, and Operation of Drawbridges
- Quantity: 23.00000 Hour
- Delivery Date:
- l1_12. Environmental and Worker Protection Unit of Measure HOUR shall read LS
- NIGP Code: 91367 Maintenance, Repair, and Operation of Drawbridges
- Quantity: 1.00000 Hour
- Delivery Date:
- l1_13. Bird Spikes Unit of Measure HOUR shall read LS
- NIGP Code: 91367 Maintenance, Repair, and Operation of Drawbridges
- Quantity: 1.00000 Hour
- Delivery Date:
B2B Follow
×
Enter Email Address:
CloseSubmit
B2B Unfollow
×
Enter Email Address:
CloseSubmit
Add B2B Posting
×
Contact Name:
Company Name:
Email Address:
Phone Number:
SWaM Certifications:
Micro Business
Small Business
Minority Owned Business
Women Owned Business
Service Disabled Veteran Owned
Employment Service Org
Micro Business
Small Business
Minority Owned Business
Women Owned Business
Service Disabled Veteran Owned
Employment Service Org
Message:
CloseSubmit
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.