Virginia Bids > Bid Detail
ITB #23-2585-8JL (Upham Brook Trunk Sewer Brook Ro...
Agency: | State Government of Virginia |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD14089111067423414 |
Posted Date: | Dec 4, 2023 |
Due Date: | Dec 13, 2023 |
Solicitation No: | IFB 35101-2 |
Source: | To access the bid document, please visit the agency's website at below and search by your matched keyword: https://mvendor.cgieva.com/Ven... |
Views: Current Version (
30
)
All Versions
(
823
)
Details
Details
IFB-35101
-
ITB #23-2585-8JL (Upham Brook Trunk Sewer Brook Road to Route 301 - Contract 2 - Gravity Sewers, Structures, and Appurtenances)
i - Round:2
- Status: Open
- Time Left:8 days, 20 hours
- Closing:12/13/23 2:30 PM
- Issued:10/4/23 1:34 PM
- Last Updated:12/4/23
- Buyer:Jianchong Luo
-
luo001@henrico.us - 804-501-5688
IFB-35101
-
ITB #23-2585-8JL (Upham Brook Trunk Sewer Brook Road to Route 301 - Contract 2 - Gravity Sewers, Structures, and Appurtenances)
i - Round:2
- Status: Open
- Time Left:8 days, 20 hours
- Closing:12/13/23 2:30 PM
- Issued:10/4/23 1:34 PM
- Last Updated:12/4/23
- Buyer:Jianchong Luo
-
luo001@henrico.us - 804-501-5688
Actions
- Issued By:Henrico County Government
- Opportunity Type:Invitation for Bids (IFB)
- Category:Construction
- Work Location:County of Henrico, VA
- Website:
- Pre-Bid Conference:See solicitation documents for optional prebid/proposal conference/site visit.
- Open Responses:See solicitation documents Public Opening information.
-
Summary:Furnishing and installing Fiberglass Reinforced Plastic (FRP) pipe according to the following schedule:
Approximate Amount (lf) Diameter (in)
350 30
330 42
160 48
3132 66
1550 72
Connecting existing sewer to new 72” sewer, including transfer of flows; providing 11 precast fiberglass lined concrete manholes with plastic sheet lined top slabs; providing new reinforced concrete manholes; providing five (5) new control chambers with vents; connecting the new 72” and 66” sewers to the existing 66” sewers; connecting new 66” sewers to new manholes AMH-23 and AMH-24 (PROVIDED AND INSTALLED BY OTHER CONTRACTOR (Contract #1), including transfer of flow; furnishing and installing about 1,820 linear feet of electrical conduit and associated pull holes; furnishing and installing about 3,740 linear feet of 2” HDPE conduit and associated pull holes for future fiber optic cable; providing ALL temporary bypass pumping system for existing sewer relocations and for making connection to existing and new sewers; providing cleanup and landscaping of all disturbed areas; and all other work stated or required to provide a complete and tested new sewer system as shown on the plans and in this project manual.
- Round Information:Addendum No. 2 post on 12/4/23.
Documents
Document | Size | Description | Posted On | Type |
Addendum No. 1.pdf | (139.2 KB) | Addendum No. 1 | 10/31/23 | RFx Document |
ITB Notice.pdf | (171.03 KB) | ITB Notice | 10/4/23 | RFx Document |
Addendum No .2_C2.pdf | (46.5 KB) | Addendum No. 2 | 12/4/23 | RFx Document |
Follow B2B ActivityUnfollow B2B ActivityAdd B2B Posting
There are no B2B messages to display
B2B Follow
×
Enter Email Address:
CloseSubmit
B2B Unfollow
×
Enter Email Address:
CloseSubmit
Add B2B Posting
×
Contact Name:
Company Name:
Email Address:
Phone Number:
SWaM Certifications:
Micro Business
Small Business
Minority Owned Business
Women Owned Business
Service Disabled Veteran Owned
Employment Service Org
Micro Business
Small Business
Minority Owned Business
Women Owned Business
Service Disabled Veteran Owned
Employment Service Org
Message:
CloseSubmit
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.