Description:
|
The proposed work consists of installing equipment that introduces zinc orthophosphate corrosion inhibitor at 7 well sites throughout the County in order to protect distribution system piping and residential piping from corrosion. The improvements are based on the recommendations from an evaluation that was completed to assess JCSA’s Central System Source water entry points and water distribution system water quality. The project includes the installation of the chemical feed pumping skids, tanks, piping, and other appurtenances. This project also includes the building, site, electrical, plumbing and control modifications for the additional chemical feed systems. The well sites are as follows:
W-1 Owens Illinois
W-4 Pottery
W-5 Ewell Hall
W-22 Canterbury Hills
W-25 Stonehouse
|
|