Virginia Bids > Bid Detail

Memorial Hall Water Infiltration Project PHASE 1

Agency: State Government of Virginia
Level of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD14089972122418287
Posted Date: Mar 17, 2023
Due Date: Mar 28, 2023
Solicitation No: IFB 11691-2
Source:

To access the bid document, please visit the agency's website at below and search by your matched keyword:

https://mvendor.cgieva.com/Ven...
Views: Current Version ( ) All Versions ( )
Details


IFB-11691


  • Memorial Hall Water Infiltration Project PHASE 1
    i
  • Small Business Set-Aside for Award Priority
  • Round:2
  • Status: Open
  • Time Left:10 days, 18 hours
  • Closing:3/28/23 2:00 PM
  • Issued:2/28/23 9:52 AM
  • Last Updated:3/17/23
  • Buyer:Kathleen Tomlin

  • tomlinkh@vmi.edu
  • 540-464-7166



IFB-11691


  • Memorial Hall Water Infiltration Project PHASE 1
    i
  • Small Business Set-Aside for Award Priority
  • Round:2
  • Status: Open
  • Time Left:10 days, 18 hours
  • Closing:3/28/23 2:00 PM
  • Issued:2/28/23 9:52 AM
  • Last Updated:3/17/23
  • Buyer:Kathleen Tomlin

  • tomlinkh@vmi.edu
  • 540-464-7166

  • Issued By:Virginia Military Institute
  • Opportunity Type:Invitation for Bids (IFB)
  • Category:Construction
  • Work Location:Lexington, VA - Virginia Military Post
  • Website:www.vmi.edu
  • Pre-Bid Conference:See solicitation documents for mandatory prebid/proposal conference/site visit.
  • Open Responses:See solicitation documents Public Opening information.
  • Summary:The project is generally described as site work, storm water modifications, and building repairs.
  • Round Information:Added Addendum 2

Documents
Document Size Description Posted On Type
Invitation for Bid - PHASE 1.pdf (156.33 KB) Invitation for Bid Documents 2/27/23 RFx Document
ADDENDUM 1.pdf (525.85 KB) ADDENDUM 1 3/15/23 RFx Document
ADDENDUM 2.pdf (32.57 MB) ADDENDUM 2 3/17/23 RFx Document
BID FORM JM Hall PHASE 1.pdf (89.27 KB) Invitation for Bid Documents 2/27/23 RFx Document
VMI Memorial Hall Water Mitigation Construction Drawings PHASE 1.pdf (44.05 MB) Invitation for Bid Documents 2/27/23 RFx Document
ATTENDANCE ROSTER.pdf (97.13 KB) ATTENDANCE ROSTER 3/10/23 RFx Document
VMI Memorial Hall Water MitigationProject Manual.pdf (16.33 MB) Invitation for Bid Documents 2/27/23 RFx Document
Follow B2B ActivityUnfollow B2B ActivityAdd B2B Posting
There are no B2B messages to display
  • Grid 1 - Response
    • I1_1. Lump sum price for construction within a perimeter extending 5 feet from the walls of the building, complete, and in accordance with the Plans and Specifications:
    • NIGP Code:
    • Quantity: 1.00000 lump sum
    • Delivery Date:

    • I1_2. Lump sum price for the sitework beyond the 5 feet building perimeter, complete, and in accordance with the Plans and Specifications:
    • NIGP Code:
    • Quantity: 1.00000 lump sum
    • Delivery Date:

    • I1_3. Excavation of ROCK material, where authorized or directed, proper disposal off-site of excess material and backfill with compacted trench fill material per specifications. (price per cubic yard). Final amount shall be adjusted upward or downward based on actual quantity authorized.
    • NIGP Code:
    • Quantity: 20.00000 cubic yard
    • Delivery Date:

    B2B Follow ×
    Enter Email Address:
    CloseSubmit
    B2B Unfollow ×
    Enter Email Address:
    CloseSubmit
    Add B2B Posting ×
    Contact Name:
    Company Name:
    Email Address:
    Phone Number:
    SWaM Certifications:

    Micro Business

    Small Business

    Minority Owned Business

    Women Owned Business

    Service Disabled Veteran Owned

    Employment Service Org
    Message:
    CloseSubmit

    TRY FOR FREE

    Not a USAOPPS Member Yet?

    Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

    Start Free Trial Today >