Virginia Bids > Bid Detail
Memorial Hall Water Infiltration Project PHASE 1
Agency: | State Government of Virginia |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD14089972122418287 |
Posted Date: | Mar 17, 2023 |
Due Date: | Mar 28, 2023 |
Solicitation No: | IFB 11691-2 |
Source: | To access the bid document, please visit the agency's website at below and search by your matched keyword: https://mvendor.cgieva.com/Ven... |
Views: Current Version (
)
All Versions
(
)
Details
Details
IFB-11691
-
Memorial Hall Water Infiltration Project PHASE 1
i - Small Business Set-Aside for Award Priority
- Round:2
- Status: Open
- Time Left:10 days, 18 hours
- Closing:3/28/23 2:00 PM
- Issued:2/28/23 9:52 AM
- Last Updated:3/17/23
- Buyer:Kathleen Tomlin
-
tomlinkh@vmi.edu - 540-464-7166
IFB-11691
-
Memorial Hall Water Infiltration Project PHASE 1
i - Small Business Set-Aside for Award Priority
- Round:2
- Status: Open
- Time Left:10 days, 18 hours
- Closing:3/28/23 2:00 PM
- Issued:2/28/23 9:52 AM
- Last Updated:3/17/23
- Buyer:Kathleen Tomlin
-
tomlinkh@vmi.edu - 540-464-7166
Actions
- Issued By:Virginia Military Institute
- Opportunity Type:Invitation for Bids (IFB)
- Category:Construction
- Work Location:Lexington, VA - Virginia Military Post
- Website:www.vmi.edu
- Pre-Bid Conference:See solicitation documents for mandatory prebid/proposal conference/site visit.
- Open Responses:See solicitation documents Public Opening information.
- Summary:The project is generally described as site work, storm water modifications, and building repairs.
- Round Information:Added Addendum 2
Documents
Document | Size | Description | Posted On | Type |
Invitation for Bid - PHASE 1.pdf | (156.33 KB) | Invitation for Bid Documents | 2/27/23 | RFx Document |
ADDENDUM 1.pdf | (525.85 KB) | ADDENDUM 1 | 3/15/23 | RFx Document |
ADDENDUM 2.pdf | (32.57 MB) | ADDENDUM 2 | 3/17/23 | RFx Document |
BID FORM JM Hall PHASE 1.pdf | (89.27 KB) | Invitation for Bid Documents | 2/27/23 | RFx Document |
VMI Memorial Hall Water Mitigation Construction Drawings PHASE 1.pdf | (44.05 MB) | Invitation for Bid Documents | 2/27/23 | RFx Document |
ATTENDANCE ROSTER.pdf | (97.13 KB) | ATTENDANCE ROSTER | 3/10/23 | RFx Document |
VMI Memorial Hall Water MitigationProject Manual.pdf | (16.33 MB) | Invitation for Bid Documents | 2/27/23 | RFx Document |
Follow B2B ActivityUnfollow B2B ActivityAdd B2B Posting
There are no B2B messages to display
- I1_1. Lump sum price for construction within a perimeter extending 5 feet from the walls of the building, complete, and in accordance with the Plans and Specifications:
- NIGP Code:
- Quantity: 1.00000 lump sum
- Delivery Date:
- I1_2. Lump sum price for the sitework beyond the 5 feet building perimeter, complete, and in accordance with the Plans and Specifications:
- NIGP Code:
- Quantity: 1.00000 lump sum
- Delivery Date:
- I1_3. Excavation of ROCK material, where authorized or directed, proper disposal off-site of excess material and backfill with compacted trench fill material per specifications. (price per cubic yard). Final amount shall be adjusted upward or downward based on actual quantity authorized.
- NIGP Code:
- Quantity: 20.00000 cubic yard
- Delivery Date:
B2B Follow
×
Enter Email Address:
CloseSubmit
B2B Unfollow
×
Enter Email Address:
CloseSubmit
Add B2B Posting
×
Contact Name:
Company Name:
Email Address:
Phone Number:
SWaM Certifications:
Micro Business
Small Business
Minority Owned Business
Women Owned Business
Service Disabled Veteran Owned
Employment Service Org
Micro Business
Small Business
Minority Owned Business
Women Owned Business
Service Disabled Veteran Owned
Employment Service Org
Message:
CloseSubmit
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.