Virginia Bids > Bid Detail
IFB #2023-03-VPA NNIT Optimization
Agency: | State Government of Virginia |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD14089251721515387 |
Posted Date: | Feb 23, 2023 |
Due Date: | Feb 28, 2023 |
Solicitation No: | IFB 8658-9 |
Source: | To access the bid document, please visit the agency's website at below and search by your matched keyword: https://mvendor.cgieva.com/Ven... |
Views: Current Version (
94
)
All Versions
(
1918
)
Details
Details
IFB-8658
-
IFB #2023-03-VPA NNIT Optimization
i - Round:9
- Status: Open
- Time Left:4 days, 18 hours
- Closing:2/28/23 2:00 PM
- Issued:1/15/23 3:57 PM
- Last Updated:2/22/23
- Buyer:Erin Griggs
-
egriggs@portofvirginia.com - 757-440-2890
IFB-8658
-
IFB #2023-03-VPA NNIT Optimization
i - Round:9
- Status: Open
- Time Left:4 days, 18 hours
- Closing:2/28/23 2:00 PM
- Issued:1/15/23 3:57 PM
- Last Updated:2/22/23
- Buyer:Erin Griggs
-
egriggs@portofvirginia.com - 757-440-2890
Actions
- Issued By:Virginia Port Authority
- Opportunity Type:Invitation for Bids (IFB)
- Category:Construction
- Work Location:Norfolk, VA
- Website:
- Pre-Bid Conference:See solicitation documents for mandatory prebid/proposal conference/site visit.
- Open Responses:See solicitation documents Public Opening information.
- Summary:The Project contemplated consists of, but is not limited to, the redevelopment of approximately 74 acres of terminal property, eighteen new semi-automated container yard stacks (demolition, grading, paving, drainage, removal and replacement of roller compacted concrete, removal of reinforced concrete, underground utilities, pavement markings, signage, light pole foundations, crane rails, crane tie downs, reefer racks, etc); shuttle carrier parking rack, underground fire protection distribution system, electrical sub-station building, modular electrical substation equipment, equipment wash building, high mast yard lighting, and electrical and communications services throughout the project limits.
- Round Information:Addendum 4
Documents
NNIT Optimization Drawings 4200-400 SERIES IFB Unlocked.pdf
NNIT Optimization Specifications Unlocked.pdf
Addendum_4-unlocked.pdf
NNIT Optimization Specifications.pdf
2023-03-VPA NNIT Optimization Project - Addendum_3 Unlocked.pdf
NNIT Optimization Drawings 4200-200 SERIES IFB.pdf
NNIT Optimization Drawings 4200-500 SERIES IFB Unlocked.pdf
2023-03-VPA NNIT Optimization Project - Addendum_3 Locked.pdf
NNIT Optimization Drawings 4200-100 SERIES IFB Unlocked.pdf
NNIT Optimization Drawings 4200-100 SERIES IFB.pdf
NNIT Optimization Drawings 4200-600 SERIES IFB.pdf
NNIT Optimization Drawings 4200-000 SERIES IFB.pdf
Attachment 2.pdf
NNIT Optimization Drawings 4200-200 SERIES IFB Unlocked.pdf
NNIT Optimization Drawings 4200-300 SERIES IFB Unlocked.pdf
NNIT Optimization Drawings 4200-500 SERIES IFB.pdf
Addendum_2-unlocked.pdf
Attachment 1.pdf
Addendum 1-locked.pdf
Addendum_2-locked.pdf
Addendum_4-locked.pdf
Attachment 4.pdf
NNIT Optimization Drawings 4200-400 SERIES IFB.pdf
NNIT Optimization Drawings 4200-000 SERIES IFB Unlocked.pdf
Attachment 3.pdf
Addendum 1-unlocked.pdf
NNIT Optimization Drawings4200-300 SERIES IFB.pdf
NNIT Optimization Drawings 4200-600 SERIES IFB Unlocked.pdf
Documents
Document | Size | Description | Posted On | Type |
NNIT Optimization Drawings 4200-400 SERIES IFB Unlocked.pdf | (92.82 MB) | NNIT Optimization Drawings 4200-400 SERIES IFB Unlocked | 1/15/23 | RFx Document |
NNIT Optimization Specifications Unlocked.pdf | (7.79 MB) | NNIT Optimization Specification Unlocked | 1/15/23 | RFx Document |
Addendum_4-unlocked.pdf | (89.3 MB) | Addendum 4 unlocked | 2/22/23 | RFx Document |
NNIT Optimization Specifications.pdf | (7.82 MB) | Solicitation #2023-03-VPA NNIT Optimization | 1/15/23 | RFx Document |
2023-03-VPA NNIT Optimization Project - Addendum_3 Unlocked.pdf | (28.21 MB) | Addendum 3 Unlocked | 2/18/23 | RFx Document |
NNIT Optimization Drawings 4200-200 SERIES IFB.pdf | (92.04 MB) | NNIT Optimization Drawings Series 4200-200 | 1/15/23 | RFx Document |
NNIT Optimization Drawings 4200-500 SERIES IFB Unlocked.pdf | (22.23 MB) | NNIT Optimization Drawings 4200-500 SERIES IFB Unlocked | 1/15/23 | RFx Document |
2023-03-VPA NNIT Optimization Project - Addendum_3 Locked.pdf | (28.36 MB) | Addendum 3 Locked | 2/18/23 | RFx Document |
NNIT Optimization Drawings 4200-100 SERIES IFB Unlocked.pdf | (69.84 MB) | NNIT Optimization Drawings 4200-100 SERIES IFB Unlocked | 1/15/23 | RFx Document |
NNIT Optimization Drawings 4200-100 SERIES IFB.pdf | (69.84 MB) | NNIT Optimization Drawings Series 4200-100 | 1/15/23 | RFx Document |
NNIT Optimization Drawings 4200-600 SERIES IFB.pdf | (41.7 MB) | NNIT Optimization Drawings Series 4200-600 | 1/15/23 | RFx Document |
NNIT Optimization Drawings 4200-000 SERIES IFB.pdf | (116.18 MB) | NNIT Optimization Drawings Series 4200 000 | 1/15/23 | RFx Document |
Attachment 2.pdf | (1.83 MB) | Attachment 2 | 1/15/23 | RFx Document |
NNIT Optimization Drawings 4200-200 SERIES IFB Unlocked.pdf | (91.93 MB) | NNIT Optimization Drawings 4200-200 SERIES IFB Unlocked | 1/15/23 | RFx Document |
NNIT Optimization Drawings 4200-300 SERIES IFB Unlocked.pdf | (183.66 MB) | NNIT Optimization Drawings 4200-300 SERIES IFB Unlocked | 1/15/23 | RFx Document |
NNIT Optimization Drawings 4200-500 SERIES IFB.pdf | (22.24 MB) | NNIT Optimization Drawings Series 4200-500 | 1/15/23 | RFx Document |
Addendum_2-unlocked.pdf | (20.4 MB) | Addendum 2-unlocked | 2/13/23 | RFx Document |
Attachment 1.pdf | (26.39 MB) | Attachment 1 | 1/15/23 | RFx Document |
Addendum 1-locked.pdf | (87 MB) | Addendum 1-locked | 2/2/23 | RFx Document |
Addendum_2-locked.pdf | (20.42 MB) | Addendum 2-Locked | 2/13/23 | RFx Document |
Addendum_4-locked.pdf | (90.05 MB) | Addendum 4 Locked | 2/22/23 | RFx Document |
Attachment 4.pdf | (15.13 MB) | Attachment 4 | 1/15/23 | RFx Document |
NNIT Optimization Drawings 4200-400 SERIES IFB.pdf | (92.94 MB) | NNIT Optimization Drawings Series 4200-400 | 1/15/23 | RFx Document |
NNIT Optimization Drawings 4200-000 SERIES IFB Unlocked.pdf | (116.12 MB) | NNIT Optimization Drawings 4200-000 SERIES IFB Unlocked | 1/15/23 | RFx Document |
Attachment 3.pdf | (40.92 MB) | Attachment 3 | 1/15/23 | RFx Document |
Addendum 1-unlocked.pdf | (87.11 MB) | Addendum 1 unlocked | 2/2/23 | RFx Document |
NNIT Optimization Drawings4200-300 SERIES IFB.pdf | (183.78 MB) | NNIT Optimization Drawings Series 4200-300 | 1/15/23 | RFx Document |
NNIT Optimization Drawings 4200-600 SERIES IFB Unlocked.pdf | (41.67 MB) | NNIT Optimization Drawings 4200-600 SERIES IFB Unlocked | 1/15/23 | RFx Document |
Follow B2B ActivityUnfollow B2B ActivityAdd B2B Posting
There are no B2B messages to display
B2B Follow
×
Enter Email Address:
CloseSubmit
B2B Unfollow
×
Enter Email Address:
CloseSubmit
Add B2B Posting
×
Contact Name:
Company Name:
Email Address:
Phone Number:
SWaM Certifications:
Micro Business
Small Business
Minority Owned Business
Women Owned Business
Service Disabled Veteran Owned
Employment Service Org
Micro Business
Small Business
Minority Owned Business
Women Owned Business
Service Disabled Veteran Owned
Employment Service Org
Message:
CloseSubmit
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.