The Work under this Project consists of the following:
The scope of work consists of renovating all existing restrooms in the facility. Plumbing work includes, but is not limited to, replacing toilets, urinals, lavatories, and sinks. Architectural work includes, but is not limited to, removing and salvaging toilet accessories, painting, and re-installing salvaged toilet accessories. Two additive alternates contemplate (1) replacing ceramic floor tile and wainscot in gang restrooms, and (2) replacing drop-in classroom sinks that have built-in water fountain bubblers.
The base scope of work includes:
-
Replace floor-mounted toilets and flush valves.
-
Replace wall-hung urinals and flush valves.
-
Replace wall-hung lavatories.
-
Replace drop-in kitchen sinks in work rooms and