NOZZLE, SEGMENT, TURB / 06F / AIRCRAFT, HERCULES C-130
Agency: | DEPT OF DEFENSE |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159069933376722 |
Posted Date: | Jan 28, 2023 |
Due Date: | Mar 13, 2023 |
Solicitation No: | SPE4A723R0376 |
Source: | https://sam.gov/opp/fd236b5a86... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Presolicitation (Original)
- All Dates/Times are: (UTC-05:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Jan 28, 2023 01:35 pm EST
- Original Response Date: Mar 13, 2023 03:00 pm EDT
- Inactive Policy: 15 days after response date
- Original Inactive Date:
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 2840 - GAS TURBINES AND JET ENGINES, AIRCRAFT, PRIME MOVING; AND COMPONENTS
-
NAICS Code:
- 336412 - Aircraft Engine and Engine Parts Manufacturing
-
Place of Performance:
Richmond , VA 23297USA
NOZZLE, SEGMENT, TURB / 06F / AIRCRAFT, HERCULES C-130
NSN: 2840-01-509-4413, IQC PR: 1000161232, ITEM: NOZZLE, SEGMENT, TURB
THIS PART IS MANUFACTURED BY THE FOLLOWING SOURCES: ROLLS-ROYCE CORPORATION DBA, CAGE 63005, P/N 23031783 AND PACIFIC SKY SUPPLY INC., CAGE 66905, P/N 23031783. THE SOLICITATION WILL BE ISSUED AS A 100% SMALL BUSINESS SET-ASIDE (FULL AND OPEN COMPETITION AFTER THE EXCLUSION OF SOURCES).
THIS PROCUREMENT IS FOR AN INDEFINITE QUANTITY CONTRACT (IQC) FOR A BASE PERIOD OF 5 YEARS WITH ZERO (0) OPTIONS. THE ESTIMATED ANNUAL QUANTITY IS 212 EACH. GOVERNMENT FIRST ARTICLE TESTING AND CONTRACTOR PRODUCTION LOT TESTING ARE REQUIRED. DELIVERY OF THE FIRST ARTICLE UNITS WILL BE 300 DAYS ARO. GOVERNMENT TESTING, EVALUATION, AND NOTIFICATION WILL BE 180 DAYS. CONTRACTOR PRODUCTION LOT TEST REPORT WILL BE 300 DAYS AFTER FIRST ARTICLE APPROVAL. GOVERNMENT EVALUATION OF PLT AND NOTIFICATION WILL BE 60 DAYS AFTER PRODUCTION LOT TEST. DELIVERY OF THE PRODUCTION UNITS WILL BE 30 DAYS AFTER GOVERNMENT APPROVAL. FOB IS AT DESTINATION. FIRST ARTICLE TERMS: INSPECTION AT ORIGIN, ACCEPTANCE AT DESTINATION. PRODUCTION UNIT TERMS: INSPECTION AND ACCEPTANCE AT ORIGIN.
A COPY OF THE SOLICITATION WILL BE AVAILABLE VIA THE DLA INTERNET BID BOARD SYSTEM (DIBBS) AT HTTPS://WWW.DIBBS.BSM.DLA.MIL/RFP ON THE ISSUE DATE CITED IN THE SOLICITATION. FROM THE DIBBS HOMEPAGE, SELECT “REQUESTS FOR PROPOSAL (RFP) / INVITATION FOR BID (IFB)” FROM THE MENU UNDER THE TAB “SOLICITATIONS.” THEN SEARCH FOR AND CHOOSE THE RFP YOU WISH TO DOWNLOAD. SOLICITATIONS ARE IN PORTABLE DOCUMENT FORMAT (PDF). TO DOWNLOAD AND VIEW THESE DOCUMENTS YOU WILL NEED THE LATEST VERSION OF ADOBE ACROBAT READER. THIS SOFTWARE IS AVAILABLE FREE AT HTTP://WWW.ADOBE.COM. A PAPER COPY OF THE SOLICITATION WILL NOT BE AVAILABLE TO REQUESTORS. THE SOLICITATION WILL BE ISSUED ON OR ABOUT FEBRUARY 13, 2023
- ASC SUPPLIER OPER AE AND AF DIV 6090 STRATHMORE ROAD
- RICHMOND , VA 23237
- USA
- Ryan Loeffelholz
- ryan.loeffelholz@dla.mil
- Phone Number 8042791452
- Jan 28, 2023 01:35 pm ESTPresolicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.